• CGR10-07 "Equilibria, Stability, and Transients in Re-entrant Lines under FBFS and LBFS Dispatch and Constant Release"
  • CGR12-04 "Production Lead Time Problem: Formulation and Solution for Bernoulli Serial Lines"
  • "QLC-Based Design of Reference Tracking Controllers for Systems with Asymmetric Saturating Actuators"
  • "Resilient Plant Monitoring System: Design, Analysis, and Performance Evaluation"
  • CGR13-03 "Cellular Production Lines with Asymptotically Reliable Bernoulli Machines: Lead Time Analysis and Control"

  • CGR13-05 "Combating Curse of Dimensionality in Resilient Plant Monitoring Systems: Overlapping Decomposition with Intra- and Inter-Subplant Inferences"

  • CGR13-06 "Production Lead Time in Exponential Serial Lines: Analysis and Control"

  • CGR14-02 "Resilient Plant Monitoring Systems: Techniques, Analysis, Design, and Performance Evaluation"

  • CGR14-03 "Production Lead Time in Serial Lines: Evaluation, Analysis, and Control"

  • "Proof of the Theorem in NSF Proposal “Multi-job Production Systems Engineering”"

  • "A Method for "Sweet Point" Operation of Re-entrant Lines"

  • "Characteristic Curves, Sweet Points, and Lead Time Control of Re-entrant Lines"

  • "Multi-job Production Systems: Definition, Problems, and Product-mix Performance Portrait of Serial Lines"

  • "SMART PRODUCTION SYSTEMS: ARCHITECTURE AND APPLICATION TO MULTI-JOB MANUFACTURING"

  • "Precise Estimates of MTBF and MTTR: Definitions, Calculations, and Effect on Machine Efficiency and Throughput Evaluation in Serial Production Lines"

  • "The (alpha,beta)-Precise Estimates of MTBF and MTTR: Definitions, Calculations, and Induced Effect on Machine Efficiency Evaluation"

  • "Production Systems with Cycle Overrun Full Data 041821"